| Key Facts |
Employees: -- Total Average Daily Production in 2006: -- Crude Processing Capacity: -- Major Office Locations: -- |
Exploration and Production ConocoPhillips’ presence in Azerbaijan is comprised of its interest in the Baku-Tbilisi-Ceyhan (BTC) Pipeline. This 1,100-mile pipeline, completed in 2006, transports crude oil from the Caspian Region through Azerbaijan, Georgia and Turkey for tanker loadings at the Mediterranean port of Ceyhan. The pipeline’s nameplate capacity is 1 MMBD, and ConocoPhillips has a net capacity of 25 MBD.
|